Wednesday 22 October 2014

Countdown...Days 11 and 10

Tuesday Severin came back up and helped really tie up some loose ends.  Specifically, flooring in the Master Bedroom and a nice new attic hatch lid for our new location.





This morning the HVAC guy came back around.  Went in the crawlspace to lift and support all the flex pipes off the ground and run the drain for the air handling unit outside.  Thanks Aaron!


Aaaaaaaaaaaaaaaand this is what the kitchen looked like this morning...





This is what it looked like about 1 hr into the job.  That is Adam...he's a magician...he makes unlevel parallelograms (that would be our kitchen walls) disappear!




By lunch time...



By 5pm...



And then this happened.  Those are my counter plugs which are supposed to be under the breakfast bar on the kitchen side.  Guess I overlooked the height of the backsplash on that one!  With some creativity and thankful the wall is made of wood panelling on the other side, we relocated one plug and deleted the other.  I will install a custom piece of trim underneath where the breakfast bar overhangs and it will not be noticeable!




Relocated the wire and cut in a new box in our pantry cabinet, facing the left side of the breakfast bar...so it's very close to where it was and will work just fine.




Voila!



Then I got a call from the granite guy...he was en route to install the breakfast bar.  So, we did that too!  Still some finishing trim pieces to install now that it's in place.