Monday, 8 September 2014

Plumbing Rough In

First, let me say that although Plumbing seems like a pretty simple trade, I have a new respect for Plumbers.  As I watched and participated in the rough in installation, I realized with what ease the Plumber was able to walk through the job, and if I had gone into it blind I would've definitely overlooked a few things!  But I did learn a couple "tricks of the trade" as they say, so I'm pretty excited about that!

All the plumbing is out of the walls and stubbed down into the crawlspace as we needed to get ready for drywall installation this week.  We were also able to insulate a few key walls as well.  As of this afternoon...we are ready!!!

Here's just a couple pics a snapped at the end of the day.

Hose Bib to one of our two exterior water tap sources!

All the pipes have been run into the crawlspace for the Plumber to return to at a later date and tie it all together.

A shower/tub combo for the boys...their very own!

Well insulated exterior walls.

Any shared walls with our neighbors got "Safe & Sound" insulation for better sound dampening and fire rating.

More awesome insulation!

If you look through all those wires you'll see the toilet drain and two sets of water sources for the boys vanity.

Kitchen supply and drain/vent lines.  Notice the extra dishwasher hookup on the left set of white pipes!

Same kitchen area, just showing the effort the Plumber took to make sure everything was up to code.

Boys bathroom vanity supply and drain/vent lines.  And a few protection plates to keep drywall screws away ;-)


Sunday, 7 September 2014

Framing and Electrical Rough In Complete

New Electrical Sub-Panel.  This services all of the newly renovated areas, which is really most of the house!
Electrical Sub Panel all wired and labeled.  This was quite therapeutic.

The kitchen.  New Breakfast Bar opening to the left.

Looking into the new Bathroom.  Completely new layout!  Kind of hard to tell though ;-)

Directly in front is the new Laundry Closet.  It used to be inside the Mudroom, now it opens into the "clean" side of the house.  And hopefully will be a little quieter for the neighbors who we share a wall with.

Mudroom.  Panorama distorts the picture big time, but trust me, it's amazing.

Big Panorama of the living room left to right.

School room.  Notice the electrical receptacles at two levels to accommodate above table power options!

Demolition Stage

Kitchen cabinets gone.

Mouse house bottom right.  Broken electrical box.  Cast iron abandoned pipe. 
Bathroom gutted.

Bathroom being gutted.

Hot Water Tank in Bathroom.  Lot's of hole for mice entry!

7 Layers of flooring.  There's plywood under the grey material on the right.

Live wires...insulation disintegrated.

Mudroom and Laundry area main entrance.

Inside the Mudroom looking into the house.

Oh the flooring

How many holes in the ceiling where mice can freely commute.

Did I mention the flooring?

The ONLY rot found in the house.  Master Bedroom where an old bathroom used to be (I think)

Up it comes!

Rot gone.

Textured ceilings...bye bye.

Original 200amp panel...bye bye.

Awkward upper corner in kitchen where old chimney was located...let's just say things didn't quite line up.

Oh hello there...welcome to our home...and by our home I mean your (mice) home.

Under the floor is...the leftover brick chimney, covered with cardboard.

Panorama view of mostly gutted main living areas and some beginnings of new framing.

Panorama view of some new framing from standing in the living room 

Panorama view standing in the kitchen.

Pre Reno Pictures...

Here's what our place looked like before the renos starting happening...















Thursday, 28 August 2014

Renovations 101

Quite often I am asked just exactly why we are doing renovations or what was in the house that was so bad.  Quite simply, the reality is that in many ways we didn't know what to expect except the fact that the house was very old and multiple previous renovations had been done over the decades.

Here's what we DIDN'T find:

- Mold.  

The house is very dry and even though the exterior walls had not been insulated for decades (just done last year!), there was virtually no obvious mold.  I believe that because the house is built of grade A wood and had lots of air going through it, and a wood burning fireplace, the place was able to breathe and stay dry if it ever even got damp to begin with.

- Asbestos.

We were expecting that at least the "vinyl" tiles under a few layers of carpet would be made with asbestos.  We had them tested and they came back completely negative, along with the drywall mud and tape as well!  This was a huge relief for us as we could go ahead with demolition and not worry about abatement costs.


And here's what we DID find:

- Numerous mice homes, highways and entry points.
- Shared electrical circuits throughout both sides of the duplex...on a single breaker!
- At least five different types of electrical wiring throughout the house.
- Leftovers from previous renovations, behind the walls, in the attic and down in the crawlspace.
- Seven layers of flooring...yup.  Five have been removed and we are left with the shiplap and Fir floors, which we will use as subfloors for the new materials.
- Bearing walls without much ability to bear the load!  Beams and posts have been put in place to help with these areas.
- Drywall on top of Fir panelling on top of shiplap.  No big deal, but still interesting.
- Many walls out of plumb.
- 5" out of level from one end of the house to the other!
- Multiple additions and cover ups from previous renos.


And the next post will show you what we've started to do about the above!

And so, to answer the question of why we are doing all these renos...because Jaxon needs a place of respite for at least the next three years as his immune system rebuilds itself from scratch.  What these reno's will accomplish is a sanitary environment so as to attempt to keep sickness at bay.  It will also mean that our house will make more sense layout wise; that each room will be purposed to have a family of five living in it.

Here's a list of things we are doing (or planning to do) before our family moves back home with the exception of our master bedroom ensuite bathroom which will get a new exhaust fan, toilet and wiring:

- Complete gut of kitchen, main bathroom, hallway, mudroom, school room and most of the living room.
- Re-wire entire side of Zalinko residence, completely isolating both sides of the duplex.
- Completely new HVAC system (wood fireplace gone, heat pump & air handler with electric backup installed)
- All new plumbing and fixtures.
- All new flooring.
- All new cabinets and countertops (Kitchen, Bathroom, Laundry, Mudroom).
- All new lighting.
- All new appliances.
- All new drywall.
- All new windows
- All new exterior skirting
- All new paint
- All new finishing carpentry
- And an updated floor plan for about half of the house in order to use the space more efficiently.

As you can probably imagine, we are quite excited about getting back to our new home.  The Imadene Foundation and countless individuals and businesses have committed to make all of this a reality for our family and we are proud to call ourselves part of the family at Camp Imadene.