All the plumbing is out of the walls and stubbed down into the crawlspace as we needed to get ready for drywall installation this week. We were also able to insulate a few key walls as well. As of this afternoon...we are ready!!!
Here's just a couple pics a snapped at the end of the day.
Hose Bib to one of our two exterior water tap sources! |
All the pipes have been run into the crawlspace for the Plumber to return to at a later date and tie it all together. |
A shower/tub combo for the boys...their very own! |
Well insulated exterior walls. |
Any shared walls with our neighbors got "Safe & Sound" insulation for better sound dampening and fire rating. |
More awesome insulation! |
If you look through all those wires you'll see the toilet drain and two sets of water sources for the boys vanity. |
Kitchen supply and drain/vent lines. Notice the extra dishwasher hookup on the left set of white pipes! |
Same kitchen area, just showing the effort the Plumber took to make sure everything was up to code. |
Boys bathroom vanity supply and drain/vent lines. And a few protection plates to keep drywall screws away ;-) |