HVAC was a no show today, so hopefully that gets wrapped up early next week. It's almost as if people don't enjoy crawling around in confined spaces with insulation and dirt all around them...pfff.
The Plumber stopped by and installed the Hot Water Tank today as well. Good 'ol John Wood 60 Gallon with 8yr warranty. She's a Beaut!
I also stopped by a local door manufacturer (Wescan Doors) and asked about a few doors we are needing. The wonderful lady at the front counter showed me down to their selection of doors where I picked out the three I needed. We then went upstairs where she informed me that I would only be paying for the pre-hanging portion and the rest was no charge. So, basically got $1200 in doors for $300. They are Fir grade doors that we will stain. We wanted to be able to install doors that would fit in with the existing wood doors and the rich heritage of the building itself. Pretty stoked to be honest. They will look very similar to these, only stained.
With the drywall completed and sanded out, the painter (Geoff Holland Painting) came in today and essentially primed the entire house, sanded and top coated one layer on the living room ceiling. It's really beginning to come together! These two characters were amazing!
No comments:
Post a Comment